Full View
Similar items
Custom Small Medium Large Dog Cat Collar Personalized Engraved Name ID Adjustable Nylon Puppy Chihuahua Pug Dogs Collars
DKK33.84
DKK55.20 -38% OFF
Mermaid Theme Iridescent Pet Collar Soft Comfort Inner Lining For Small Pets
DKK33.65
DKK52.47 -35% OFF
Navy Blue Velvet Custom Luxury Designer Collar With Safety Walking Lead 3PCS Traction Set Perfect For Dog Lovers
DKK28.39
DKK45.39 -37% OFF
Dog Slip Collar,No Pull Choker Dogs,Slip Collars With Slidable Stopper,Martingale Collar For Small Medium Large Dogs
DKK32.99
DKK46.36 -28% OFF
Choker Small Puppy Neck Collars For Dogs Big Decorative Dog Collar GXQ07
DKK34.26
DKK44.51 -23% OFF
Luxury Personalized Dog Collar Harness Leash Set Custom, Collar With Engraved Name Buckle, Dog Harness And Leash Set DIY
DKK28.24
DKK42.48 -33% OFF
New Heart Leather Durable Puppy Pug Collars Chihuahua Dog Cat Accessories Pet Collar For Small Dogs
DKK34.22
DKK51.68 -33% OFF
Nylon Dog Training P Chain Pet Outdoor Walking Supplies Traction Leads Small Large Running Free Hands Rope Dogs Leash
DKK37.61
DKK55.23 -31% OFF
Custom Dog Personalized Pet Collars And Leash Set Durable Leather Collar Lead For Small Medium Large Dogs
DKK35.97
DKK46.17 -22% OFF
Personalized Buckle Pet Puppy ID Tag Collar Custom Nylon Dog Heart Tags Nameplate Adjustable For Medium Large Dogs
DKK34.79
DKK55.88 -37% OFF
1.5 1.8 3 6 10 15 20 30 50M Solid Leash For Large Dogs Pet Puppy Walking Training Lead Big Dog Nylon Rope Long Leashes
DKK231.74DKK359.95
Color : C794-Black 1.5M









Quantity :
Report
Include copyright infringementFree Standard Shipping. See details
Estimated between Thu, Aug 6 and Tue, Aug 11
You can return the product within 30 days of receipt. See details
Shop with confidence
Money Back Guarantee
Get the item you ordered or your money back. Learn more
About this item
Sourced from Pet Supplies Mall
Seller assumes all responsibility for this listing.Item number: 40384255
Item specifics
Item description from the seller
Long Strong Nylon Dog Leash 10m 15m 20m Pet Training Leash For Small Big Dogs Outdoor Walking Puppy Lead Rope Labrodor Supplies
Product:Nylon Dog Leash
Color:Black
Length:1.5m/1.8m/3m/6m/10m/15m/20m/30m/50m*2cm
Feature:Durable,Nylon Material, Long ,Strong,Durable,Convenient to operate
Support:Dropshipping and Wholesale
Suit:Outdoor,Hiking,Walking
Suit for:Small,Medium,Large Dogs,Cats,Puppy ( Yorkie,Chihuahua,French Bulldog,Dachshund,Beagle,Schnauzer,Poodles,Pitbull,Golden retriever,Labrador retriever,German Shepherd)
NOTE
1.Due to manual measurement, please allow a measurement deviation of 0.5-1 cm.
2.Due to the difference in display and lighting effects, the actual color of the item may be slightly different from the color shown on the picture.








Videos
Videos for this product







